Following a hailstorm, urgent work was carried out to secure the unstable parts of an asbestos-cement roof and sheet metal construction. The activities included the removal of the asbestos roof, waste management with collection, sorting, washing, packaging and labelling according to the EWC classification and the subsequent restoration of the roof with insulated sheet-metal panels. The work ended with waste loading, transport and disposal, as well as sampling and environmental analyses.